Return to Iron Control

FMI Morenci Arizona – Iron Control Demonstration project

FENIX Iron Control unit installed at Morenci

Morenci mine site

Cu electrolyte solutions before (left) & after processing (right)

The FENIX Iron Control system was transported from Australia to FMI’s Morenci operation in Arizona, USA for a successful demonstration trial in mid 2008.

 

 

Permanent link to this article: http://www.fenixhydromet.com/technology/iron-control-overview/morenci-iron-control-demonstration-project/